Customer Helpline

+91-2474517557

When you need parts, time is very often of the essence.

It is good that we hold the world's largest source of high-pressure equipment.

Proven and Reliable industrial Networks

For the Oil and gas industry

You expect premium performance

and a wide range of products. We can supply you with every­ thing from a single source.

we've been committed to creating highly-engaged

lifelong relationships between our MFR and clients

LSTE has become more than just a supplier

we're a people engage in providing solution to the clients problem By bringing together those in need of assistance for their emergency requirement with those who love to provide it.

Dewatring

LSTE offers wide range of Dewatering Pumps, Hoses & Accessories is done by pumping or evaporation and is usually done before excavation for footings or to lower water table that might be causing problems during excavations. Dewatering can also be known as the process of removing water from soil by wet classification.

Construction of buildings, powerhouses, dams, locks and many other structures requires excavation below the water table into water-bearing soils. Such excavations require lowering

the water table below the slopes and bottom of the excavation to prevent raveling or sloughing of the slope and to ensure dry, firm working conditions for construction operations.

Groundwater can be controlled by means of one or more types of dewatering systems appropriate to the size and depth of the excavation, geological conditions, and characteristics of the soil.

Construction sites are dewatered for the following purposes:

  • To provide suitable working surface of the bottom of the excavation.
  • To stabilize the banks of the excavation thus avoiding the hazards of slides and sloughing.
  • To prevent disturbance of the soil at the bottom of excavation caused by boils or piping. Such disturbances may reduce the bearing power of the soil.

Lowering the water table can also be utilized to increase the effective weight of the soil and consolidate the soil layers. Reducing lateral loads on sheeting and bracing is another way of use.

A number of methods are available for controlling the inflow of water into an excavation; the choice of method will depend on the nature and permeability of the ground, the extent of the

area to be dewatered, the depth of the water table below ground level and the amount by which it has to be lowered, the proposed methods of excavation and ground support, the

proximity of existing structures, the proximity of water courses etc.

In middle east region most popular applicable dewatering system is Well point systems with suction pumps.

WE HAVE FOLLOWING PUMPS, HOSES & ACCESSORIES IN STOCK

MILLER DEWATERING PUMP
Diameter Inch (INLET/OUTLET)
4
6
8
12
MILLER MALE COUPLING
Diameter Inch
4
6
8
12

MILLER FEMALE COUPLING
Diameter Inch
4
6
8
12
MILLER MALE END CAP
Diameter Inch
4
6
8

MILLER FEMALE END CAP
Diameter Inch
4
6
8
MILLER FEMALE BRANCH “T” JOINT
Diameter Inch
6
8

MILLER FEMALE BRANCH “T” JOINT
Diameter Inch
6
8
MILLER 90° BEND
Diameter Inch
6
8

MILLER 45° BEND
Diameter Inch
6
8
MILLER MALE WITH FLANGE
Diameter Inch
4
6
8

MILLER FEMALE WITH FLANGE
Diameter Inch
4
6
8
MILLER HEADER PIPE WITH MUSHROOM
Diameter Inch
6

MILLER FEMALE INLET “Y” JOINT
Diameter Inch
2
STRAINER WITH HOSE
Diameter Inch
4
5
6
8

RUBBER BUNG
Diameter Inch
2
RUBBER “O” RING
Diameter Inch
2
3
4
6
8

PVC PIPE MENDOR
Diameter Inch
2
3
4
5
6
8
PVC CLEAR HOSE
Length Diameter Inch
UPTO 30 METER 2
UPTO 30 METER 4
UPTO 20 METER 6

PVC LAY FLAT HOSE
Length Diameter Inch
50/100 METER 2
50/100 METER 3
50/100 METER 4
50/100 METER 6
50/100 METER 8
50 METER 12
RUBBER SUCTION HOSE
Length Diameter Inch
UPTO 40 METER 4
UPTO 30 METER 6
UPTO 20 METER 8

HOSE CLIPS
Diameter Inch
2
3
4
6
8
12
SINGLE BOLT HOSE CLAMP
Diameter Inch
4
6
8

PVC WELL POINT
Diameter Inch
2